Commercial estimating
Trade packages, vendor quotes and alternates for tenant improvements and ground-up bids.
Takeoffs · Estimates · Preconstruction
Know your scope before you bid.
Construction estimates and trade takeoffs organized around your drawings, bid packages and deadlines.
Construction estimating turns bid drawings into measured quantities and a documented cost basis. Request a quantity-only takeoff when your team supplies the rates. Request a priced estimate when the bid also needs labor, material and equipment costs.
Confirm the drawing revision before pricing.
General contractors can request an estimate organized by bid package. Subcontractors can request a takeoff for one trade, building or phase. Developers can use a preliminary budget to see how an early design choice changes the scope before the drawings are complete.
Trade packages, vendor quotes and alternates for tenant improvements and ground-up bids.
Separate the structure, finishes and owner selections in your build or renovation budget.
Price installation scope, equipment interfaces and work windows by package.
Placements, reinforcing, formwork and slab accessories.
Partitions and ceilings organized by assembly, height and board layers.
Equipment, distribution, connections and control responsibilities.
Grading, utility and paving scope with visible haul assumptions.
Roof areas, edges, penetrations and assembly details.
Units, grout, reinforcing and wall accessories by assembly.
Room quantities, transitions and finish-specific preparation.
Member lists, connection assumptions and erection interfaces.
Send the current drawings, addenda, project location, deadline and the trades you need covered.
Agree on the deliverables, turnaround and boundaries of the estimate before work begins.
Use the organized quantities, references and assumptions to price or check the package.
A useful estimate records the measurement unit, plan reference and revision alongside the quantity. Separating the measured amount from waste and pricing assumptions lets a contractor change one input without losing the original basis.
Yes. Specify the trade, the takeoff units and how you want the quantities broken down. A quantity-only sheet can be priced with your own crews and suppliers.
Send the latest issued bid or design set and every applicable addendum. If a revised sheet replaces one from an earlier set, identify it in the request.
The quote reflects the trades, drawing completeness, required output and deadline. A single-trade count and a full construction budget are scoped separately.
Identify the decision in an assumption or clarification log. Where a placeholder is needed, show the basis and the potential impact so your team can review it.
Demolition, revised partitions and shared MEP connections.
Foundations, framing and owner-selected finishes.
Equipment pads, utility runs and shutdown interfaces.
Grading, utilities, paving and restoration limits.
Room schedules, building systems and temporary protection.
Power distribution, cooling and equipment interfaces.
Roof areas, flashings and edge details.
Slabs, reinforcing and contact form areas.
Start with the project city or ZIP and bid documents. Browse the state pages for bid scope and drawing requirements.